banner
Products
Our product and service portfolio encompasses a range of exceptional options for you.
300A Norminal Current Transformer Hall Sensors Measuring Device

300A Norminal Current Transformer Hall Sensors Measuring Device

Product Description 1.Product pictures 2.Features: firm structure. low power consumption. small size. easy installation.;
Basic Info
Model NO. GWHOS
Shape of Core Laminated
Brand Grewin
Retardant Rating 94-V0
Exterior Material PBT Resin UL Flame
Interior Insulation Epoxy Encapsulated
Isolation Current 2500 Vrms for 1 Minute
Dielectric Resistance 1000 M Ohms 500 VDC
Surge Withstand 5000V
Operating Temperature 25 to 55c, -40 to +85c Optional
Frequency 50 to 400 Hz
Accuracy Class 0.2 0.1
Transport Package Export Standard Cartons with Strong Pallets
Specification CE ROHS
Trademark grewin
Origin China
HS Code 850450000
Production Capacity 50000 PCS /Week
Product Description

Product Description

1.Product pictures

300A Norminal Current Transformer Hall Sensors Measuring Device



300A Norminal Current Transformer Hall Sensors Measuring Device


300A Norminal Current Transformer Hall Sensors Measuring Device


2.Features:
firm structure.
low power consumption.
small size.
easy installation.
vibration resistance.
water vapor proof and dust proof

3.Application:
It applies hall effect principle, can measure direct current, alternating current, pulse and current of various irregular wave forms in electrical isolation conditions.

4.Specification:
Measuring frequency: 0-100KHz
Accuracy: 0.2%-1%
Responding time: <1μs
Linearity: 0.1%
No measuring insertion loss
AC,DC Measuring AC, DC and pulse current
High isolation between primary current and secondary output signal
Manufactured by close-loop hall magnetic compensation principle

5.Outline dimension

300A Norminal Current Transformer Hall Sensors Measuring Device

 

6.Details of the data

300A Norminal Current Transformer Hall Sensors Measuring Device

 

Company introduction

1.certification
We have passed ISO9001:2015,CE,SGS approval and IEC report


2.Company profile
Tianjin Grewin is concentrating on transformers for 20 Years and complianted by ISO9001:2015,CB,IEC CB,CE etc.We're always pay great attention to its business philosophy "Quality and Honesty First".Grewin is specialized in the design and manufacture of wound components such as transformer,current sensors, chokes etc .windely used in communications,electronics,meters,industrial control,medical equipments and other fields.We are also a provider of power meters and instruments locators. 85% of its products exported to America, Europe, and Asia etc.We sincerely invite you to join us to create a bright future.

3.Terms of Shipment:
(1)Products are shipped via UPS / DHL / EMS / HK EMS / FedEx / TNT and so on expresses (door to door).
(2)We Provide Drop shipping Service.
(3)20 days around delivery upon receiving payment if the qty is lower than 1000PCS and it is not customized products.
(4)In order to ensure you receive your order tax free upon
import, we declare lower value.
(5)Shipping via EMS. UPS. FedEx and TNT express usually takes 3~7days dependent on the destination country.

4.Payment terms:
(1)T/T 100% or 50% deposit by T/T in advance, balance amount to be paid 7 days before
delivery.
(2) By irrevocable L/C at sight, to be issued immediately against confirmed order.
(3)Payment by T/T, if order amount is less than USD 20,000.

5.Warranty:
(1)We provide 1 year warranty.
(2)If the product is defective, please notify us within 3 days of delivery.
(3)All products must be returned on their original condition, in order to qualify for a refund or exchange of goods

6.Production
The following picture showed you about all finished transformer production line and package with export standard carton and strong pallets:

 

7.Flow chart of trading activities:

NO

Step

Days need

1

Request for quotation

1 day

2

Making quotations

1 day

3

Offer and counter offer

3 days

4

Sending and receiving samples

3-10 days

5

Sample confirmation

3 days

6

Placing a firm order

1 day

7

Paying and receiving the down payment

1-4 day

8

Factory production & Quality inspection

15-20 days

9

Paying and receiving the balance

4 days

10

Delivery of goods

1 days

8.contact


Send inquiry